DOCKSIDE DEMONSTRATION
12:00:00 WISL Dockside Facility 05 MAR 1996
1. LII List Expected Inbound Trips
2. AIT Accept Inbound Trip
3. SIT Scan Inbound Trip
4. LIO List Outbound Trips
5. COT Create Outbound Trip
6. LOT Load Outbound Trip
7. SOT Status Control for Outbound Trip
8. LDT Load Delivery Trip
9. SDT Status Control for Deliveries
10. INV Dockside Inventory Report
99. SRT EXIT Shipment Control Menu
XXX Enter Function Code <SRT>
The Expected Inbound trips include all incoming
dispatch trips and any linehaul trips sent from other