Distribution Control Demonstration
12:00:00 WDC Demo Installation 16 SEP 1996
Trip Selection Screen - TRS
AA 2. Status PL-Planned,LO-Loading,SE-Sent,CL-Closed,OP-Open(un-accept)
The trip ID information is presented for review and updating. Once this data is verified, a menu is presented for the generation of any of the trip documentation. The documents displayed on the following menu are samples; specific formats and other requirements can be handled differently for each installation.
4. Carrier:1 Challenger Motor Freight